Risa Edelstein is the VP of Marketing for ECHOtape (www.echotape.com), a manufacturer of construction tapes. She oversees strategic marketing for ECHOtape and has been writing about seaming the building envelope for ECHOtape's blog for the past 5 years. As building codes evolve and construction practices change, she helps companies understand the critical role tape can play in air sealing. She can be reached at risae@echotape.com.

March 1, 2019

What is the building envelope and why does it matter? How can it fail? What role does tape play in air sealing? In this article, we demystify the building envelope, helping builders and contractors identify weak spots in building tightness in order to improve air sealing, and create more structures that are sustainable, cost-effective, and comfortable in all conditions.

By nature, we do not expect our environment to maintain a consistent, 74°F, 50% humidity, climate. Our perception of comfort is quite adaptive and is based on circumstance, the expectation of environmental conditions, and activities. We use umbrellas when it’s raining. We dress in layers when it’s cold. We use sunscreen when exposed to summer’s intense UV rays. And yet, we expect our homes to provide thermal comfort and protection from the natural elements, at a consistent 74°F, every day. Walls, roofs, windows, and doors all play a role, but it’s the building envelope that makes this possible.

What Is a Building Envelope?

At its simplest definition, the building envelope is the exterior or shell of a building that repels the elements. At its most complex definition, it’s an engineering system that meshes elements such as structural integrity, moisture control, temperature control, and air-pressure boundaries into a single design strategy.

It is the physical separator between the conditioned and unconditioned environment of a building, including the resistance to air, water, heat, light, and noise transfer. It’s the part of the building that you can draw a line around: the roof, the walls, and the foundation.

While the building envelope is a silhouette of sorts, it’s important to remember that these are compounded layers. Each part of the building envelope must be thought of as a collection of smaller pieces working together to provide structural support. The way the foundation and walls are built is essential in creating a sturdy structure, or a base, for the rest of the building. This is one of the main functions of construction because a well-constructed envelope is necessary to simply keep the structure standing. The building’s design must be measured and carried out meticulously to ensure that there are no open edges, cracks between the windows and walls and imperfections between the roof and the walls, or between the walls and the foundation. It is all included within the building envelope concept.

That said, each part of the enclosure faces different challenges. Roofs are bombarded by heat, rain, and hail; walls contend with wind and rain; and foundations are always surrounded by wet, damp earth. On a construction level, the building’s envelope is a series of composite layers—whether it be wood, glass, veneer, drywall, etc.—each with their own permeable properties that must be considered. A proper building enclosure works together to achieve the same goals of stopping or slowing the flow of air, water, and heat, while still allowing the inevitable intrusion of water as a way to dry out.

Why Do Building Envelopes Matter?

All told, building envelope components work together to perform 4 basic, but critical functions: structural support, moisture management, temperature regulation, and air flow. The latter 3—moisture, air, and thermal—characterize the “control” functions of the building envelope, those facets that ensure a building is energy efficient, comfortable, and sustainable.

  1. Moisture control. The most important element of the envelope’s control is its ability to regulate the transfer of moisture. Moisture presents a distinct danger to the overall integrity of a building and must be taken into account. Moisture can and will impact your building over your head (roof), under your feet (basement/floor), and on your sides (walls). Each component must be addressed to prevent the unwanted transfer from causing expensive damage. It’s essential in all climates, but cold climates and hot-humid climates are especially demanding.
  2.  Air control. Controlling air flow is key to controlling energy consumption, ensuring indoor air quality, avoiding condensation, and providing comfort. Control of air movement includes flow through the enclosure or through components of the building envelope itself, as well as into and out of the interior space. So, for example, when we talk of a building’s draftiness, we’re talking about the control of air flow.
  3. Thermal control.  Thermal transfer brings to mind how comfortable we feel inside buildings. Is it too hot? Is it too cold? If you want to address this question, it is easiest to look up. As we learned in elementary school, heat rises, and if you don’t have enough resistance in the building to prevent heat from rising right through the roof, it is time to raise your building envelope IQ to prevent heat (and money) from escaping.

What Is Building Tightness?

Building envelopes are often characterized as either “tight” or “loose.” A loose building envelope allows more of a natural air transfer to occur, which improves indoor air quality and can remove the need for mechanical ventilation. These types of building envelopes make the building more drafty and uncomfortable; it also makes it harder to regulate temperature levels. This creates a higher chance of mold or mildew, and higher quantities of heated or cooled air are able to escape through leaks in the loose building envelope. This will increase energy bills along with negatively impacting the environment by releasing more greenhouse gases.

A tight building envelope allows for a high level of control over indoor air quality, temperature, humidity levels, and energy consumption. This requires more insulation, caulk, adhesive tape, sealants, and energy-efficient windows to acquire a tight shell for the building. This leads to fewer drafts and a more comfortable building for its occupants, which often results in less waste in heating and cooling costs. Tight envelopes also have a lower chance of producing mold or mildew from moisture infiltration; this can help prolong the life of the building components. The downside to a tighter building envelope is it requires more extensive mechanical ventilation systems because it limits how much natural ventilation can occur.

Additionally, good building envelopes that prevent drafts and other air leaks allow for tighter control of the air pressure inside as well as the temperature. Without that, cooling and heating sources are constantly fighting the exterior elements that are making their way inside the building. Not only is this expensive, it makes being inside the building uncomfortable. For example, a home where the air conditioning system has been shut off all weekend would take longer to cool on Monday morning if the building design allows for leaks and drafts. The tight envelope provides the ability to adequately control the quality of the air, making the interior of the building more comfortable and pleasant.What Are

Best Practices for Building Envelope Systems?

I’ve said it before and I’ll say it again: Build it tight; vent it right. Without a virtually airtight, well-insulated building envelope, achieving the energy performance levels required for current IECC building codes and California Title 24 is nearly impossible without a massive investment in renewable energy systems. The good news for builders is that getting the building envelope right is one of the lower-cost, higher-return investments when designing for net-zero performance. It all boils down to good building practices.

According to ProBuilder.com, to make air sealing your top priority, concentrate on insulation. Focus on sealing the areas along the top and bottom plates, particularly around the perimeter in the attic area and along the foundation, whether it’s a basement, crawlspace, or slab, so that you’re not getting convective loops in your walls.

Why Do Building Envelope Systems Fail?

When the building envelope system is designed and constructed properly, very few occupants pay attention. But when the building envelope fails (and even the best-built projects do in time), everyone notices. Those failures can include aesthetic loss, corrosion, poor indoor air quality, energy inefficiencies, and, in some cases, life-threatening structural failure and eventual litigation—a builder’s worst nightmare.
What are the main reasons envelope systems fail?

  1. Design deficiencies. Architects occasionally specify materials or design systems that are inappropriate for their intended use. Common mistakes include specifying materials that are incompatible with materials with which they come into contact or have inadequate performance criteria for thermal movement, structural capacity, or water-penetration resistance. Issues also arise when subcontractors try to reduce the weight, size, or amount of building envelope components (aluminum, glass, sealants, flashing, etc.) required on a project. This can lead to inadequate performance or capacity of the materials specified.
  2. Material failure. It’s also common for properly specified materials to fail to meet the published performance levels. This could be a result of errors in the manufacturing, handling, or storing of the product or components within the product. Common examples include degrading sealant adhesion, laminated glass delamination, and metal fatigue. While the anticipated performance levels are often based upon measured statistical performance, the strength of materials varies.
  3. Poor workmanship. During construction booms, the problem of poor workmanship is exasperated as a result of having many inexperienced, unsupervised, and untrained personnel working on projects. It is common to find building envelope components not installed per the manufacturing specifications. Word to the wise: Putting the right people in the right job goes a long way toward proper installation and overall profitability.
  4. Acts of nature. Even with flawless installations, bad things can happen to good work when environmental conditions exceed those that were anticipated during design. The effects of hurricane-force wind loads, driving rain, and extreme temperature fluctuations can overload a properly designed and constructed building envelope, causing damage to the system and making it vulnerable to further deterioration or failure. While failures of this type cannot be stopped, many can be prevented through routine inspection and maintenance to identify small problems before they become big ones.

Building envelope is vital for energy savings, thermal comfort, and sustainability. Taking the time to make sure the appropriate materials are installed—properly—will benefit a building and its occupants for years to come.

 

 

Copyright Statement

This article was published in the March 2019 issue of Insulation Outlook magazine. Copyright © 2019 National Insulation Association. All rights reserved. The contents of this website and Insulation Outlook magazine may not be reproduced in any means, in whole or in part, without the prior written permission of the publisher and NIA. Any unauthorized duplication is strictly prohibited and would violate NIA’s copyright and may violate other copyright agreements that NIA has with authors and partners. Contact publisher@insulation.org to reprint or reproduce this content.

Related Articles

Quick Contractor Questions: Insulation Outlook Interview Series

Insulation Outlook staff recently sat down with some NIA members for a conversation about what’s going on in the world of contractors.

Read Article

Tips from an Insulation Contractor: Top 10 Ways to Keep Your Project on Time and on Budget

There are many factors that can affect the success of a project. Following are 10 of the most common issues experienced during insulation installation and solutions to ensure they don’t negatively affect the project. These issues tend to crop up repeatedly, so it is important to continually reinforce these lessons to project teams. By avoiding

Read Article

79% of Construction Firms Plan to Expand Headcount in 2019, but Most Are also Worried about Their Ability to Find Qualified Workers

Most contractors plan to add staff in 2019 to keep pace with growing demand, but are having trouble finding qualified workers. These worker shortages are having an impact on construction costs and project schedules,

Read Article

A Conversation on Commissioning

Editor’s Note: Commissioning first showed up in the building market in 1977 when Public Works Canada started using it in their project delivery system. Others got on board in the early 1980s, and the decade closed with ASHRAE Guideline 1, first published in 1989. Electric utilities promoted commissioning and its use became more widespread, including

Read Article